On Wednesday, they "loaded" in the boards. Super cool! I happened to be at the house at just the right time to see them deliver the sheetrock, and load it in through the big window opening on the second floor:
They also delivered the bags for plastering after the boards are hung:
 |
Special delivery! I opened the front door, only to see a crane full of plaster right in front of me! |
No comments:
Post a Comment